Enviroparks wins Planning Permission

I'm pleased to see that Enviroparks have been granted planning permission for their proposed waste treatment and energy plant in Hirwaun.

     £120m waste energy park for Rhondda approved

I wrote an article in March explaining why I thought this was a much better way of dealing with waste than any other process currently available. It's too long to repeat here, but this is a short extract which explains the basic technology:

The process is multifaceted, but involves recycling, the separation of food and non-food waste with food waste going to an anaerobic digester to produce gas to be used as fuel, the plasma gasification (as opposed to incineration) of other waste to again produce gas, and burning the gas from both sources to produce electricity. This animation shows how these processes work together:

The crucial difference between this and incineration is that burning the gas is clean, whereas burning waste directly gives rise to high emissions of dioxins, nitrous oxide, toxic metals and particulates. The plasma arc breaks these down into individual atomic elements.

The Wiki article is here, including a list of projects planned or already operational. Enviroparks own website is here.

Enviroparks ... a better way to deal with waste, 5 March 2010

There was quite a lively discussion in the comments section of the original post. But the way I see it, it is only by embracing this sort of technology that we can avoid the much more damaging effects of waste incineration to both the environment and public health.

Bookmark and Share
Bookmark and Share
Bookmark and Share

Much more than slightly misleading

At the beginning of this month, I wrote this article on the amount of power produced from renewable energy sources in Wales.

    Slightly Misleading

It was prompted by an article in the Western Mail which got a few things wrong, but those faults pale into insignificance compared with this story on the BBC website today, which is an almost incredible mixture of fact and misinformation:

     Wales misses wind farm energy target

So let me try and unravel the two. Firstly, the TAN 8 target set in 2005 is quoted correctly:

The provision of electricity from renewable sources is an important component of the UK energy policy, which has an established target of producing 10% of electricity production from renewable energy sources by 2010. The Assembly Government has a target of 4 TWh of electricity per annum to be produced by renewable energy by 2010 and 7 TWh by 2020.

In order to meet these targets the Assembly Government has concluded that 800 MW of additional installed (nameplate) capacity is required from onshore wind sources and a further 200 MW of installed capacity is required from offshore wind and other renewable technologies.

TAN 8, Section 1.4

So far, so good. But this is what the Welsh government is now claiming:

Five years on, the assembly government said Wales produced in excess of three terawatt hours of electricity from renewable sources.

A spokeswoman added: "Whilst we have not met the 2010 target, there is an additional five terawatt hours of electricity either in the planning system, consented or under construction, that would allow us to significantly exceed it.

"This means we are on course to significantly exceed our previous 2020 target of producing seven terawatt hours of renewable electricity annually by 2020."

This is completely wrong. In fact it is so completely wrong that it can only be called a barefaced lie.

Now I don't know what the electricity figures for 2010 are; as we are still in October, nobody can know that. But we do know what the figures for 2009 are, because they were published in DECC's Energy Trends for September in the section starting on page 25. This is the table:

     

As we can see, Wales generated just over 1.6 TWh of electricity in 2009. Of course the figure for 2010 is almost certain to be higher, mostly because of the Rhyl Flats windfarm. But adding 90 MW of capacity is only likely to deliver something like 275 GWh of electricity, and any other increase in capacity is going to be much smaller. So the 2010 figure will still be less than 2 TWh.

This cannot, by any stretch of the imagination, be called "in excess of three terawatt hours of electricity from renewable sources".

     

Jane Davidson is the Minister for Environment, Sustainability and Housing. By allowing this sort of rubbish to be published, she is making it obvious that she is not in control of her department ... well, unless she is in control, and therefore responsible for this outrageous piece of misinformation. We need to call her to account for this.

-

But let's look again at the second paragraph of the TAN 8 statement:

In order to meet these targets the Assembly Government has concluded that 800MW of additional installed (nameplate) capacity is required from onshore wind sources and a further 200MW of installed capacity is required from offshore wind and other renewable technologies.

To me this shows the total lack of realism in the document itself, which was put together when Carwyn Jones was in charge of the department. These are the actual figures for installed capacity, taken from this spreadsheet

2004 ... 230.9 MW of wind ... 429.5 MW total
2005 ... 329.8 MW of wind ... 528.8 MW total
2006 ... 359.0 MW of wind ... 558.8 MW total
2007 ... 363.2 MW of wind ... 558.8 MW total
2008 ... 375.4 MW of wind ... 574.4 MW total
2009 ... 532.6 MW of wind ... 753.3 MW total

Even if we are charitable and say that the increase promised in TAN 8 was based on the 2004 figures, we have only managed to increase our total installed capacity for wind generation by just over 300 MW. This is less than a third of the target set out by Carwyn Jones in 2005. If we take the 2005 figure as a baseline, the increase is only 200 MW or about a fifth.

That's enough to make a grown man cry. We have had a bunch of clowns in charge of our energy policy in Wales. Well meaning, perhaps, but still inept.

And yet, more by luck than judgement, there is a silver lining to this cloud. Although I am generally in favour of windfarms, I believe that the targets as set out by Carwyn Jones in the second paragraph were flawed. Offshore wind generation is much, much better than onshore wind generation. The load factors are higher, and building them offshore reduces at a stroke the vast majority of problems such as noise, flicker, transport and visual intrusion. If Carwyn Jones had shown any basic grasp of the issues involved, the figures would have been the other way round ... a 200 MW increase in onshore wind, and a 800 MW increase in offshore. So no marks for him, either.

     

But in spite of this ineptitude, we will proably meet the 2020 target ... though certainly not in the way he imagined. The next big windfarm to come on line will be Gwynt y Môr. It's capacity of 576 MW will produce maybe 2 GWh of electricity a year. After that we have the even bigger Round 3 windfarms in the Irish Sea and Bristol Channel, as I mentioned here. So the picture is not as grim as it might appear. Yet it has to be said that these windfarms have had nothing to do with the Welsh government. We have a government that likes to make out that it is really quite green, but that it is being held back by Westminster. That's why their statement says:

"Unfortunately, most of the elements that are key to us meeting the target are outside our direct control."

But where are the schemes that the Welsh government are proposing? I don't know of any big renewable energy schemes that we are putting pressure on the UK government to let us build. Our energy ministers seem happy to sit back and let Westminster make the running.

Of course I want decision making power for energy projects over 50 MW to be devolved to Wales. But devolving that power is only half of the story ... we also need to elect a government that is as ambitious for renewable energy in Wales as the SNP has shown itself to be in Scotland.

Bookmark and Share
Bookmark and Share
Bookmark and Share

Enviroparks. What better way to deal with waste?

I have to admit to being dismayed, in fact angered, by two posts yesterday from Dafydd Tristan on the proposal for a waste handling plant at Hirwaun by Enviroparks.

     Enviroparks - open letter to councillors
     If you tolerate this your children will be next

As a society, we produce a lot of waste and need to reduce it. The first way of doing it is to reduce it at source, in particular to reduce unnecessary packaging, and to make the sort of goods which last and can be repaired or upgraded rather than thrown away. The second way is to increasing the amount of waste we recycle. I'm sure there is broad consensus that we need to do both. The first is something that is rather harder to do because we buy products from all over the world, but the second is something we can deal with at local and national level. We have set ourselves targets for recycling, and we are gradually increasing the amount we recycle as a result. That's good.

But, even after doing those things, we are still left with lots of waste. The traditional way of dealing with it has been to put it into landfill sites. However we cannot continue to do that on the scale we have been doing, and there are now considerable disincentives to doing so in the form of landfill taxes which rise steeply year-on-year.

Because of that disincentive, we need to look for new ways of getting rid of waste, and the next obvious solution is to burn it, and to generate electricity from it. This explains why there have been a spate of planning applications for waste incinerators not just in Wales, but everywhere. Now yes, I would agree that burning waste is a better option than burying it. But it is not a good option ... it is simply the "next worst" option.

The reason it is bad is because it is very difficult, if not impossible to ensure that what is burnt can be burned cleanly. Therefore waste incineration produces a host of nasty emissions which are dangerous to people's health. The companies that operate such incinerators are also put in the invidious position of producing less electricity if they filter out the more dangerous waste before burning it, and of being left with waste that they can only get rid of by putting into landfill sites. They lose money if they don't burn it, and it costs them money to get rid of it. So of course the temptation will always be to burn it.

-

Now, rather than talk in general terms, let me make things more specific and more local. In the valleys next door to Cynon we have two examples of what needs to be avoided. Trecatti is a landfill site just outside Merthyr. It was a big hole in the ground, and some bright spark thought it would be a good idea to fill it. However it is far too close to residential areas in Dowlais Top and Caeharris, and the shape of the valley tends to hold the smell rather than allow it to be blown away. The same is true for the dust that the Ffos y Fran opencast mine produces ... but that's another story.

However, just a few miles south, there are plans for a huge waste incinerator (there has been talk about it taking waste from all over south Wales) by the name of Brig y Cwm at Cwmbargoed ... and the preferred operator is the American firm Covanta, which has been repeatedly fined for breaking environmental laws in its waste incineration plants over there.

So, right on Cynon's doorstep, we have two examples of what not to do.

-

Let me now turn to project proposed by Enviroparks. The process is multifaceted, but involves recycling, the separation of food and not food waste with food waste going to an anerobic digester to produce gas to be used as fuel, the plasma gasification (as opposed to incineration) of other waste to again produce gas, and burning the gas from both sources to produce electricity. This animation shows how these processes work together:

     

The crucial difference between this and incineration is that burning the gas is clean, whereas burning waste directly gives rise to high emissions of dioxins, nitrous oxide, toxic metals and particulates. The plasma arc breaks these down into individual atomic elements.

The Wiki article is here, including a list of projects planned or already operational. Enviroparks own website is here.

-

When election time approaches, politicians might be expected to say things motivated more by political rivalry than an objective analysis of any particular proposal. But this is an issue which is far too important to be treated in a partisan way.

I simply cannot see what is particularly "dangerous" about this proposal. Yes, there is waste water, but it is produced by a controlled process and is therefore as treatable as any other water waste. The danger of polluted water seeping from landfill sites is much greater. The Penderyn Reservoir is above rather than below the site, therefore it would be almost impossible for any leak to pollute it.

But if Dafydd and others think these risks are understated, then I urge you to discuss this in objective terms. Please don't resort to language like, "If you tolerate this, your children will be next." It is horribly sensationalist, if not downright offensive. You insult people's intelligence by resorting to cheap headlines of this kind. It is not the way to foster debate on an issue that concerns everyone in Wales, not just one valley.

To the Plaid councillors that voted against it and to Plaid supporters in general who read this blog, I would ask that you look at the merits of this proposal rather than just treat it as if it were just another waste incineration scheme. It is not, the process is many times more environmentally safe than ordinary incineration.

I cannot think of a better way to deal with waste. So if people are so opposed to this, I have to ask what alternative you have in mind. For me there is only one thing wrong with the Hirwaun scheme, namely that waste is brought in by truck. For all its other faults, the Brig y Cwm scheme envisages waste being brought in by rail. But that can be very easily fixed; the rail link for the old Tower Colliery stops only a hundred metres or so from the site, and is due to be upgraded for passenger use anyway. If the Enviroparks scheme was redesigned to allow waste to be brought in by rail I think it would be just about perfect.